< Back

M1.CR.1.2.0.0.3.3

Product number: 7KM000071
Reference number(s): 7KG290030
M1.CR.1.2.0.0.3.3
Product number: 7KM000071
Reference number(s): 7KG290030

Ready for shipment in 3-5 weeks

Quantity Unit price Savings
From 5 €2,831.00 5.00%
€2,980.00
Product information "M1.CR.1.2.0.0.3.3"
One of the most frequently ordered configurations is our MIA slip ring with power module (250 V / 16A), CC-Link module and flange. The slip rings are manufactured in our production in Fürstenfeldbruck (Made in Germany). The slip ring can be individually adjusted using the MIA-Configurator. This is a best-selling configuration suggestion. Among the downloads you will find the MIA product brochure, which explains the construction kit in detail.

  • C-module: Power via 4 ways plus PE (250 V / 16 A each)
  • CC-Link (10 Mbit). 2x CC link.
  • Dimensions: 90 mm diameter; 116 mm length; 3 m cable each (stator & rotor)
  • Flange diameter: 120 mm
  • Gold on gold contact technology
  • Lifetime: up to 50 million revolutions
  • Average speed: 200 rpm (max. 400 rpm)
  • Protection class: IP50
  • Housing: aluminum
  • Operating temperature: -20°C to +70°C

The C-module has four power tracks and one PE. The CC-Link module has 2x CC-Link (shielded) and 3x reserve tracks. The slip ring is delivered without a plug - the plug assembly is carried out individually by the customer.

Typical fields of application:
  • Production lines in large industrial factories (e.g. battery manufacturing lines - automotive, food industry)
  • Manufacturing systems in various industrial areas (rotary tables, classic mechanical engineering)
  • drives
  • Heaters
Delivery time:
The standard delivery time for one slip ring is approximately 3 weeks, provided that all components are in stock.
For larger quantities or in important cases, please request the delivery time from Support@schleifringonline.com. The exact delivery time is calculated on a daily basis after receipt of the order and sent to you with the order confirmation.
In the case of prepayment orders, production will not start until payment has been received.